EOR, Reservoir and Production Engineering
Drilling, Completion, Surface Facility, and Petroleum Economics
Optimasi Hidrolika Lumpur Pemboran Menggunakan Api Modified Power Law Pada Hole 8½ Sumur X Lapangan Mir
Oct 30, 2015
Read Statistic: 924
Evaluasi Masalah Bottom Hole Assembly Lepas Pada Pemboran Berarah Di Sumur X Lapangan Y
Oct 30, 2015
Read Statistic: 1021