Date Log

This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.
This is an open access journal which means that all content is freely available without charge to the user or his/her institution. The copyright in the text of individual articles (including research articles, opinion articles, and abstracts) is the property of their respective authors, subject to a Creative Commons CC-BY-SA licence granted to all others. JEEE allows the author(s) to hold the copyright without restrictions and allows the author to retain publishing rights without restrictions.
Analisis Performance Sumur X Menggunakan Metode Standing Dari Data Pressure Build Up Testing
Corresponding Author(s) : Novrianti Novrianti
Journal of Earth Energy Engineering,
Vol. 5 No. 2 (2016): OCTOBER
Abstract
The number of production wells refers to the performance of the well, which is shown in the graph of inflow performance relationship (IPR). Reservoir characteristics influence on performance of the well, type of welltest and methods that be used in the determination of IPR. By using the IPR curves, maximum flow rate and the optimal flow rate of the well will be known. Pressure Build Up test is used to know performance and a maximum flow rate of the X well. Well test conducted for 15 hours. The well produced at a constant flow rate than close the wellhead. The Pressure data and time data obtained from the well test. The result of Pressure build-up testing analysis among permeability, skin and flow efficiency. After analyzing the Pressure build-up testing permeability obtained 190 mD, skin + 1,68 and 0,83 flow efficiency. Based on the value of flow efficiency Standing method is the most appropriate method is used to analyze the productivity of X well. Standing appropriate method for wells with skin ≠ 0 and flow efficiency ≠ 1. The maximum flow rate of the X well using Standing Method on the 0,83 flow efficiency was 13,91 MMSCFD
Keywords
Download Citation
Endnote/Zotero/Mendeley (RIS)BibTeX