Economic Work Evaluation Of New Zone Behind Pipe Based On Psc Cost Recovery And Gross Split Contract In YL Field

Authors

  • Tania Indah Danastri Petroleum Engineering Department, Amirkabir University of Technology, Havez Ave, Tehran, Iran.
  • Alireza Manouchehr Petroleum Engineering Department, Amirkabir University of Technology, Havez Ave, Tehran, Iran.
  • Shamaamah Hajeera Petroleum Engineering Department, Amirkabir University of Technology, Havez Ave, Tehran

DOI:

https://doi.org/10.25299/jgeet.2024.9.2.15480

Keywords:

New Zone Behind Pipe, PSC Cost Recovery, Gross Split, Economic Indicators

Abstract

Oil production in the YL field has decreased, to increase production work was carried out New Zone Behind Pipe (NZBP). For production results to benefit contractors and the government, this project was carried out by grab into account operating and investment costs following the standard cooperation contract system that applies in Indonesia. This study aimed to calculate the economic indicators of NPV, IRR, and POT based on the PSC system cost Recovery and system gross Split. Then determine which contract was feasible more or better by comparing the final results of the economic indicators of PSC contracts and economic indicators of contracts Gross Split. This study produced a comparison based on the system growth Split more wells were considered feasible, namely 6 of the 12 wells studied, with oil production above 2.65 MSTB to 9.71 MSTB, respectively the NPV, IRR, and POT values ​​were 11.90 to 52, 5, 11% to 40%, 0 to 4.22 months. While the PSC system only 5 wells were considered feasible out of 12 wells, with oil production of 1.82 MSTB to 9.71, respectively the NPV, IRR, and POT values ​​were 13.2 to 189.80, 11% to 156%, and 0 to 6.47 months. The system Gross Split was the best cooperation contract system to be applied to the YL field.

Downloads

Download data is not yet available.

References

Apolianto, E., & Mucharam, L. (2012). Evaluasi perencanaan dan hasil perforasi berdasarkan target performa lapangan x. SPE Annual Technical Conference and Exposition, XIX(1), 13–26.

Ariyon, M. (2013). Analisis Ekonomi Pemilihan Electric Submersible Pump Pada Beberapa Vendor. Journal of Earth Energy Engineering, 2(2), 8–18.

Ariyon, M., & Dewi, E. K. (2018). Studi Perbandingan Keekonomian Pengembangan Lapangan Minyak Marjinal Menggunakan Production Sharing Contract. Seminar Nasional Teknologi Dan Rekayasa, 23–29.

Ariyon, M., Setiawan, A., & Reza, R. (2020). Economic Feasibility Study of Onshore Exploration Oil Field Development using Gross Split Contract Economic Feasibility Study of Onshore Exploration Oil Field Development using Gross Split Contract.

Daniel, H. (2017). Indonesian milestone in production-sharing contract in perspective of government take, contractor take, cost recovery and production target. Society of Petroleum Engineers - SPE/IATMI Asia Pacific Oil and Gas Conference and Exhibition 2017, 2017-Janua, 1–18.

Desyta, P., Kasmungin, S., & Wibowo, D. A. (2018). Analisa Perencanaan Reaktivasi Sumur Lapangan “Pad” Untuk Zona “a.” Penelitian Dan Karya Ilmiah, 3(2), 51.

Fajri, M. (2019). ANALISIS HUKUM SKEMA KONTRAK GROSS SPLIT TERHADAP PENINGKATAN INVESTASI HULU MINYAK DAN GASBUMI Muhammad Fajri * *. Hukum Dan Pembangunan, 50(1), 54–70.

FISU, A. A. (2019). Analisis KeFEASIBLEan Ekonomi & Finansial pada Masterplan Kawasan Industri Perikanan Kota Tarakan. 1–13.

Handika, I. (2019). INFLUENCE OF PSC CHANGES IN THE UPSTREAM SECTOR FROM COST RECOVERY SYSTEM INTO GROSS SPLIT TOWARDS THE OBLIGATION TO PAY LAND AND BUILDING TAX *. 31, 126–139.

Hernandoko, A. (2018). Implikasi Berubahnya Kontrak Bagi Hasil ( Product Sharing Contract ) Ke Kontrak Bagi Hasil Gross Split Terhadap Investasi Minyak Dan Gas Bumi Di Indonesia. VI(2), 160–167.

Jati, N., Rahman, F., Kurniawan, H., Sari, Z. F., & Puspasari, S. (2015). Design of experiment and statistical approach to optimize new zone behind pipe opportunity: North Roger Block case study. Society of Petroleum Engineers - SPE/IATMI Asia Pacific Oil and Gas Conference and Exhibition, APOGCE 2015.

Kaesti, E. Y. (2011). Keberhasilan optimasi kerja ulang pindah lapisan (kupl). 4(2), 2–7.

Kusrini, D., & Abror, M. M. (2019). Analisa Perhitungan Keekonomian Lapangan “ X ” West Java Basin Menggunakan Metode PSC ( Production Sharing Contract ). 3(2), 1–7.

Nandasari, P., & Priadythama, I. (2015). Analisis Keekonomian Proyek Perusahaan Minyak Dan Gas Bumi : Studi Kasus Abc Oil.

Newnan, D. G., Eschenbach, T. G., & Lavelle, J. P. (2004). Engineering Economic Analysis (9th ed.). Oxford University Press.

Peraturan Menteri Energi dan Sumber Daya Mineral Republik Indonesia No. 52 Th 2017 tentang Perubahan Kontrak Bagi Hasil Gross Split. (2017). Menteri ESDM.

Pramadika, H., & Satiyawira, B. (2018). Pengaruh Harga Gas Dan Komponen Variabel Terhadap Keuntungan Kontraktor Pada Gross Split. Petro, 7(3), 113.

Prasetyawati Umar, E., Rianto Pradana, E., Rauf Husain, J., & Nurwaskito, A. (2017). Perbandingan Hasil Produksi Berdasarkan Pengaruh Workover Terhadap Hasil Produksi Sumur Walio 212 Pt. Petrogas (Basin) Ltd, Kabupaten Sorong, Provinsi Papua Barat. Jurnal Geomine, 5(3), 120–123.

PT. Chevron Pacific Indonesia.(2019). Data Lapangan, Data Operasi dan Data Produksi Minyak Sumur NZBP.

Purnatiyo, D. (2014). Analisis KeFEASIBLEan Investasi Alat Dna Real Time Thermal Cycler (Rt-Pcr) Untuk Pengujian Gelatin. Jurnal PASTI, 8(2), 212–226.

Rahayu, S. A. P. (2017). Prinsip hukum dalam kontrak kerjasama kegiatan usaha hulu minyak dan gas bumi. Yuridika, 32(2), 336–354.

Rudiyono, A. (2019). Project Economic Evaluation of Low Permeability Reservoir Development Using Discounted Cash Flow Method and Real Option Analysis for Investment Decision. PETRO:Jurnal Ilmiah Teknik Perminyakan, 8(3), 81.

Rulandari, N., Rusli, B., Mirna, R., Nurmantu, S., & Setiawan, M. I. (2018). Valuation of Production Sharing Contract Cost Recovery Vs Gross Split in Earth Oil and Gas Cooperation Contracts in Indonesia and the Aspect of Public Service. Journal of Physics: Conference Series, 1114(1).

Shobah, S., Widhiyanti, H. N., Audrey, P., & Kn, M. (2015). Cost Recovery Dalam Kontrak Kerjasama Minyak Dan Gas Bumi Di Indonesia Ditinjau Dari Hukum Kontrak Internasional. Jurnal. Universitas Brawijaya, 79.

Wajong, M. (2017). Indonesia ’ s new Gross Split PSC. January, 1–17.

William, Kartoatmodjo, T., & Prima, A. (2017). Studi KeFEASIBLEan Keekonomian Pada Pengembangan Lapangan. Seminar Nasional Cendekiawan, 273–278.

Downloads

Published

2024-06-29