1.
Boer A. Perbandingan Tingkat Efisiensi Biaya Pekerjaan Bekisting Struktur Core Wall Menggunakan Metode Semi Sistem dan Climbing System Terhadap Metode Konvensional (Studi Kasus: Proyek Pembangunan Menara Bank Rakyat Indonesia Pekanbaru): Cost Efficiency Level of Formwork of Core Wall Using Semi System and Climbing System Method. SAINTIS [Internet]. 2019 Nov. 28 [cited 2026 Jun. 12];19(2):51-60. Available from: https://journal.uir.ac.id/index.php/saintis/article/view/3917