Kurniawan, W., Purnomo. R, D. and Boer, A. (2017) “Analisis Earned Value Waktu dan Biaya Proyek Konstruksi Jalan (Studi Kasus: Pelebaran Jalan Simpang Lago - Sorek I): Earned Value Analysis of the Time and Cost of the Road Construction Project (Case Study: The Widening of the Road Simpang Lago - Sorek I)”, JURNAL SAINTIS, 17(2), pp. 6–18. Available at: https://journal.uir.ac.id/index.php/saintis/article/view/2031 (Accessed: 29 June 2026).