Kurniawan, W., Purnomo. R, D., & Boer, A. (2017). Analisis Earned Value Waktu dan Biaya Proyek Konstruksi Jalan (Studi Kasus: Pelebaran Jalan Simpang Lago - Sorek I): Earned Value Analysis of the Time and Cost of the Road Construction Project (Case Study: The Widening of the Road Simpang Lago - Sorek I). JURNAL SAINTIS, 17(2), 6–18. Retrieved from https://journal.uir.ac.id/index.php/saintis/article/view/2031