(1)
Kurniawan, W.; Purnomo. R, D.; Boer, A. Analisis Earned Value Waktu Dan Biaya Proyek Konstruksi Jalan (Studi Kasus: Pelebaran Jalan Simpang Lago - Sorek I): Earned Value Analysis of the Time and Cost of the Road Construction Project (Case Study: The Widening of the Road Simpang Lago - Sorek I). SAINTIS 2017, 17, 6-18.