[1]
Kurniawan, W. et al. 2017. Analisis Earned Value Waktu dan Biaya Proyek Konstruksi Jalan (Studi Kasus: Pelebaran Jalan Simpang Lago - Sorek I): Earned Value Analysis of the Time and Cost of the Road Construction Project (Case Study: The Widening of the Road Simpang Lago - Sorek I). JURNAL SAINTIS. 17, 2 (Oct. 2017), 6–18.