[1]
Yanto Martha et al. 2024. Study Nilai Biaya Dan Waktu Alat Berat Pada Proyek Pembangunan Struktur Pipe Rack: Study of Cost and Time Value of Heavy Equipment on Pipe Rack Structure Project. JURNAL SAINTIS. 24, 02 (Oct. 2024), 103–112. DOI:https://doi.org/10.25299/saintis.2024.vol24(02).20537.