[1]
Boer, A. 2019. Perbandingan Tingkat Efisiensi Biaya Pekerjaan Bekisting Struktur Core Wall Menggunakan Metode Semi Sistem dan Climbing System Terhadap Metode Konvensional (Studi Kasus: Proyek Pembangunan Menara Bank Rakyat Indonesia Pekanbaru): Cost Efficiency Level of Formwork of Core Wall Using Semi System and Climbing System Method. JURNAL SAINTIS. 19, 2 (Nov. 2019), 51–60. DOI:https://doi.org/10.25299/saintis.2019.vol19(2).3917.